A17 Week 4

Lectures

Assignments

 

A17 Week 3

Required Reading

Assignments

Assignment points Date Time
Week 2 Quiz — NC Code — Metrology 2.5 9/13/17 11:59 PM
CAM 2.2 2.5 9/13/17 3:00 PM
Survey 3 1 9/15/17 11:59 PM

Lectures

Lab

CAM

  • CAM 2.2

At the Machines

  • Cylinder
  • Initial Engraving
  • Mill Tool Offsets
  • Mill Work Offsets

 

A17 Week 2

This week in ME1800 we will form groups, and complete our first group assignment. In class we will finish up our discussion of Art to Part and PVs and then look at issues concerning quality and measurement. We will look at topics covering measurement tools and measurement uncertainty, develop inspection plans, discuss SPC and Quality Assurance, and begin a discussion of what might cause quality problems. In labs we will continue to practice operating the CNC mills and begin to introduce turning operations on the lathes, and will go into more depth in the CAM exercises.

Assignments Due

Week 1 Quiz — Lean Manufacturing – Process Variables in Manufacturing 2.5 9/4/17 11:59 PM
Group Project 1 — Getting to know your group 2.5 9/8/17 11:59 PM
Survey 2 1 9/8/17 11:59 PM
CAM 2.1 2.5 9/8/17 11:59 PM

Lecture

Labs

In the Computer Lab area you will need to finish up CAM 1 Getting started if you haven’t already and complete the first part of CAM 2 Standard Milling Operations and features. You will learn how to create the G-Code that at the machines can read and a little about how to read it yourself sou you will at least know what the machine tool is about to do.

At the machines you will operate a mill with a little more opportunity to do something wrong than last week and depending on the schedule begin to familiarize yourself with the Haas Lathes we have i the lab. It is important for us at this point in the class for you to get a little out of phase with each other in the labs. Most lab exercises are available for longer than one week to make sure everyone has a chance to do each exercise.

A17 Week 1

To do this week

  • Lecture – Tuesday Wednesday Thursday

  • Lab – Wednesday and Thursday

  • Homework

    • Complete the Week 0 Quiz (30 August before class)
    • Get a lab voucher from the bookstore
    • Read the Class Syllabus
    • Visit http://me1800.com/downloads and download the following
      • The CNC Quick Guide for Haas Mills
      • Manufacturing 101 for Engineers (Draft 1/14/17)
      • The Art of Manufacturing (Draft 1/14/17)
    • Complete Exercises 1-4 in “Manufacturing for Engineers 101” (read pages 1-23)
      • Use the code ME1800A17 when you complete Exercise 1
    • Read Pages 1-30 in “The Art of Manufacturing”
    • Week 1 Survey
    • Week 1 Quiz

C17 Week 3

Reading

Lecture

Lab

  • Continue CAM (Computers)
  • Continue Cylinder Machining and Mill Tool Offsets, Begin Code Loading Exercise

Homework / Assignments Due

  • Week 2 Quiz Monday Tuesday at Midnight
  • Survey 2 Monday Midnight
  • CAM  Friday Midnight
  • Group Assignment 2 — Next Monday Midnight

Next Week

C17 Week 2

Reading

Lecture

  • Quality Metrology Roughness
  • Quality Metrology Roughness
  • Energy and Power

Lab

  • Continue CAM (Computers)
  • Initial Engraving (Mill), Mill Work Offsets (Mill), Cylinder Machining (Lathe)

Homework / Assignments Due

  • Week 1 Quiz Monday at Midnight
  • Survey 1 Monday Midnight
  • CAM 2.1 Friday Midnight
  • Group Assignment 1 — Friday Midnight

Next Week

We will go into detail looking at the mechanics of chip formation and forces in manufacturing processes.

 

 

C17 Week 0

To do this week

  • Lecture – Thursday 11:00-11:50 in AK233

  • Lab – NO LABS

  • Homework (Complete by 17 January 2017)

    • Get a lab voucher from the bookstore
    • Read the Class Syllabus
    • Visit http://me1800.com/downloads and download the following
      • The CNC Quick Guide for Haas Mills
      • Manufacturing 101 for Engineers (Draft 1/14/17)
      • The Art of Manufacturing (Draft 1/14/17)
    • Complete Exercises 1-4 in “Manufacturing for Engineers 101” (read pages 1-23)
      • Use the code ME1800C17 when you complete Exercise 1
    • Read Pages 1-30 in “The Art of Manufacturing”
    • Complete the Week 0 Quiz
  • Next Week

Next Week in ME1800 we will introduce Lean Manufacturing, and discuss Process Variables (PVs) in manufacturing. To prepare:

  • Read “The Art of Manufacturing” pp 31-49

A16Week3

Required Reading

Week 2 Quiz Wednesday, 14 Sept., Midnight
CAM 2.3 Wednesday, 14 Sept., Midnight
CAM 3 Friday, 16 Sept., Midnight
Week 3 Survey Friday, 16 Sept., Midnight
Group Assignment 2 Monday, 19 Sept., Midnight
Week 3 Quiz Wednesday, 21 Sept., Midnight

Tuesday Lecture

Wednesday Lecture

Thursday – Lecture

A16Week2

Required Reading

  • The Metrology Handbook  (0-87389-620-3, 978-0-87389-620-7), Bucher, Jay L..
    ASQ Quality Press, 2004. Pages 149-156.

  • Machinery’s Handbook  (0-8311-2801-1, 978-0-8311-2801-2), 28th ed. / Oberg, Erik.
    Industrial Press, Incorporated, 2008. Pages 1052-1062.

Submit for Grading

Week 1 Quiz Wednesday, 7 Sept., Midnight
CAM 2.1 Wednesday, 7 Sept., Midnight
CAM 2.2 Friday, 9 Sept., Midnight
Week 1 Survey Friday, 9 Sept., Midnight
Group Assignment 1 Monday, 12 Sept., Midnight
Week 2 Quiz Wednesday, 14 Sept., Midnight

Tuesday Lecture

  • Review PVs and Introduce Quality and Metrology
  • Slides
  • Notes

Wednesday Lecture

Thursday – Lecture

A16Week1

Required Reading

Submit for Grading

Week 0 Quiz Wednesday Midnight
Week 1 Quiz Monday Midnight
Week 1 Survey Friday Midnight
CAM 1.1 and 1.2 Friday Midnight

Tuesday Lecture

  • Intro (open in a new tab)
  • Lean (open in a new tab)

Wednesday Lecture

Thursday – No Lecture